2.Blasted material informationSectionsSheet MetalPiece Material (castings,...) Capacity (t/h; pcs/h; m2/min,...)
1 2 3 shift(s):
Shift has hours;
Week has days;
Sections days;
Uptime %
Structure of total amount of blasted material per monthConditions of parts prior to blasting / peening
Material temperature on stock (°C)
Other (please describe):
Required finish
Required Almen value
Required Rz
Micro mm
Other (please describe):
3.Technological InformationExsisting transport system (roller conveyor, hooks, belt conveyor, etc.)
Abrasive media which is used or should to be used
Dust collectorDust collector? Need to quote:
Dust collector available? Type:
Exhausting capacity:
Comments
4.Other environment condition for machine and installationBuilding layout:
Length:
Width:
Height:
Environment Working Temperature:
Min: °C
Max: °C
Environment average humidity: %
Electric power supply: kW
Wiring on site: V
Pressure air 6 bar: m3min
PLC request:
5.Competition6.Other requirements, suggestionsDelivery date: Payment options:
Suggested scope of quotation (machine(s), loading / unloading equipment, transport system, electrics,...)